LAROS MULTI INDOTEKNIK
Skip to content
  • Home
  • Our Business
    • Engineering Services
    • Procurement
    • Construction Services
    • Commissioning
  • Gallery
  • Project List
    • Experience List
    • Equipment Supporting List
January 14, 2019 admin

Gallery

Inspection Test MV Motor Switchgear

Inspection Test MV Motor Switchgear

6 Photos

Motor Control Center (MCC) & Automation Chemical PM5

Motor Control Center (MCC) & Automation Chemical PM5

3 Photos

Motor Control Center (MCC) & Automation Stock Preparation (SP5)

Motor Control Center (MCC) & Automation Stock Preparation (SP5)

3 Photos

Power Factor Improvement at MV System Substation 1

Power Factor Improvement at MV System Substation 1

3 Photos

Supply, Installation & Commissioning  Flow Meter in PM5

Supply, Installation & Commissioning Flow Meter in PM5

3 Photos

Supply, Installation & Commissioning  Gas O2 Analyzer Coal Boiler

Supply, Installation & Commissioning Gas O2 Analyzer Coal Boiler

3 Photos

Replacing Electric Pump PMK 1

Replacing Electric Pump PMK 1

8 Photos

Project of Service Installation on Switchyard

Project of Service Installation on Switchyard

4 Photos

Replacement Electric Equipment Air Circuit Breaker (ACB)

Replacement Electric Equipment Air Circuit Breaker (ACB)

5 Photos

Installation Cable Ladder _ LV Cable WWTP

Installation Cable Ladder _ LV Cable WWTP

5 Photos

Installation VFD Area PM1

Installation VFD Area PM1

4 Photos

Feeder 11,5 kV of Incinerator from Power Plant GT

Feeder 11,5 kV of Incinerator from Power Plant GT

7 Photos

Inspection MV Switchgear Annual Contract

Inspection MV Switchgear Annual Contract

14 Photos

Inspection Transformer Annual Contract

Inspection Transformer Annual Contract

4 Photos

Replacement Relay Protection MV Motor Switchgear

Replacement Relay Protection MV Motor Switchgear

5 Photos

Installation Visual _ Audio Alarm Conveyor

Installation Visual _ Audio Alarm Conveyor

10 Photos

Commisioning GT Frequency Protection

Commisioning GT Frequency Protection

6 Photos

Testing GT Auxiliary Electrical Compartment

Testing GT Auxiliary Electrical Compartment

13 Photos

Inspection dan Commisioning Test Panel MCC Area WWTP

Inspection dan Commisioning Test Panel MCC Area WWTP

7 Photos

Installation Rectifier Charger and Battery NICD Area Power Plant

7 Photos

SLO _ Electrical Installation On Switchyard _ Substation 1

SLO _ Electrical Installation On Switchyard _ Substation 1

13 Photos

 Inspection Transformer 10 MVA of Switchyard

Inspection Transformer 10 MVA of Switchyard

10 Photos

Installation Flammable Tank Grounding

Installation Flammable Tank Grounding

15 Photos


Motto

Total Solution for Technical Services

Budaya Kerja

Loyalitas, Militan & Integritas

Search

Jl. Citra Harmoni Jl. Raya Beringin Kulon No.5,
Dusun Kemendung, Trosobo, Kec. Taman,
Kabupaten Sidoarjo, Jawa Timur 61257
larosmultiindoteknik@gmail.com
support@laros-epcc.com
(+62) 31 - 99788392
developed by LMI